Arnold NextG

Structured Development at Arnold NextG

Arnold NextG modular drive-by-wire vehicle

At Nextedy, we believe that independence should know no bounds. That’s why we support innovators like Arnold NextG in building drive-by-wire systems that not only push the frontier of autonomous mobility, but also restore freedom to people with disabilities.

Enabling Future Mobility Through Excellence in Engineering

Arnold NextG’s drive-by-wire system lays the foundation for the next generation of autonomous mobility — while also empowering people with disabilities to regain independence through tailored vehicle solutions.

The Nextedy Checklist and Gantt play a vital role in this success — by providing clear structures, reliable planning, and seamless integration into the Polarion engineering environment.

Drive-by-Wire System at Arnold NextG – Powered by Nextedy Gantt and Checklist

At Arnold NextG, the focus lies on the development of a modern, modular drive-by-wire system designed to serve two key application areas:

  1. Industrial projects in autonomous driving – such as automated utility vehicles, logistics systems, or special mobility solutions.

  2. Mobility solutions for people with disabilities

Both use cases require maximum safety, traceability, and engineering quality. To structure daily work efficiently and ensure full compliance with the requirements of safety-critical systems, Arnold NextG relies on two powerful Polarion extensions developed by Nextedy: Checklist and Gantt. 

Arnold NextG drive-by-wire vehicle cockpit

Nextedy Gantt – Real-Time Planning at Arnold NextG

Developing a drive-by-wire system involves multiple layers: mechanics, embedded software, validation, system integration. The Nextedy Gantt for Polarion brings clarity to this complexity:

Nextedy Gantt resource-planning panel in Polarion

 

  • Real-time Gantt charts: Automatically generated based on existing Polarion data, including task dates and dependencies.

  • Flexible detail levels: Project managers can view the entire project timeline, while individual teams focus on their own scope — all within the same tool.

  • Cross-team coordination: Gantt views significantly simplify coordination with external partners like Paravan, e.g., for scheduling integration tests or delivery phases.

Nextedy Checklist – Full Control Over ToDos and Reviews

The Nextedy Checklist enables intuitive and effective task tracking directly within Polarion — a major benefit in the context of a safety-critical system like Drive-by-Wire:

Nextedy Checklist in Polarion
  • Task-integrated ToDo tracking: Development activities such as software architecture reviews, code compliance checks, testing criteria, or FMEA actions can be structured as Checklist items.

  • Standardized review checklists: For safety-related reviews, predefined checklists are shown automatically, aligned with ISO 26262 requirements.

  • Complete traceability: Every Checklist item is tracked and documented — a clear advantage for audits, certifications, and internal QA.

Outcome: Structured, Transparent Development at the Highest Level

By integrating Checklist and Gantt from Nextedy into Polarion, Arnold NextG has achieved measurable improvements in the development of its drive-by-wire platform:

  • Consistent, reliable review processes fully embedded in workflows

  • Audit-compliant safety documentation for certification readiness

  • Transparent project planning across teams and with partners

  • Increased efficiency by eliminating redundant tools and manual processes